Assessment Year | 1992 |
---|---|
Principal Product | CLIPPERS AND BLADES |
NAICS |
n/a
|
SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
Sales Range | $10 M to 50M |
# of Employees | 270 |
Plant Area |
n/a
|
Annual Production | 3,600,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $75,537 | 1,178,195 |
kWh
|
$0.064 |
Natural Gas | $26,852 | 7,215 |
MMBtu
|
$3.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,453 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,747 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $395 | $5 |
$585
9,086
kWh
|
- | $(-190.0) | |
02 | 2.6232: Install set-back timers | $370 | $400 |
$370
5,862
kWh
|
- | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,747 | $500 | - |
$1,747
-
MMBtu
|
- | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,583 | $2,800 |
$2,104
32,825
kWh
|
$(-521.0)
-
MMBtu
|
- | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,483 | - |
$1,577
-
kWh
|
- | $(-94.0) | |
06 | 2.2437: Recover waste heat from equipment | $844 | $2,000 | - |
$844
-
MMBtu
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $381 | $1,280 |
$381
5,862
kWh
|
- | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $349 | - |
$349
5,569
kWh
|
- | - | |
09 | 2.8121: Apply for tax-free status for energy purchases | $2,301 | - |
$1,985
-
kWh
|
$316
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $9,453 | $6,985 |
$7,351
59,204
kWh
|
$2,386
-
MMBtu
|
$(-284.0) | ||
TOTAL IMPLEMENTED | $1,747 | $500 | - |
$1,747
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs