ITAC Assessment: UD1112
ITAC logo
ITAC Assessment: UD1112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Food storage and distribution
NAICS 493120: Refrigerated Warehousing and Storage
SIC 4222: Refrigerated Warehousing and Storage
Sales Range less than $500
k
# of Employees 282
Plant Area 330,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $842,070 9,989,515
kWh
Electricity Fees $1,629 -
Natural Gas $85,353 10,986
MMBtu
TOTAL YEARLY COSTS $929,052
RECOMMENDED SAVINGS* $275,263 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $876 $18,000 $876
10,945
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,314 $15,600 $15,314
191,428
kWh
- -
03 2.9114: Use solar heat to make electricty $109,901 $2,116,590 $109,901
1,373,768
kWh
- -
04 2.2628: Utilize a less expensive cooling method $204 $150 $204
2,555
kWh
- -
05 2.7231: Use radiant heater for spot heating $42,184 $60,000 $22,053
275,656
kWh
- $20,131
-
MMBtu
06 2.2628: Utilize a less expensive cooling method $105,155 $50,000 $105,155
1,313,441
kWh
- -
07 2.3212: Optimize plant power factor $1,161 $15,790 - $1,161 -
08 2.3212: Optimize plant power factor $468 $5,674 - $468 -
TOTAL RECOMMENDED $275,263 $2,281,804 $253,503
3,167,793
kWh
$1,629 $20,131
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs