Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product High Prssure Pipe Fittings
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 60,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,073 1,564,505
kWh
Electricity Demand $93,288 13,470
kW-mo/yr
Natural Gas $73,646 10,531
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,196 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $3,395 $1,000 $2,284
63,970
kWh
$1,111
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,492 - $2,349
65,797
kWh
$1,143
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $13,648 $33,900 - - $13,648 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,017 $100 $3,017
84,504
kWh
- - -
05 2.2426: Use waste heat from flue gases to heat space conditioning air $10,644 $20,000 - - - $10,644
-
MMBtu
TOTAL RECOMMENDED $34,196 $55,000 $7,650
214,271
kWh
$2,254
-
kW-mo/yr
$13,648 $10,644
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs