| Assessment Year | 1986 |
|---|---|
| Principal Product | RECON. STEEL DRUMS |
| NAICS |
n/a
|
| SIC | 3412: Metal Shipping Barrels, Drums, Kegs, and Pails |
| Sales Range | $5 M to 10M |
| # of Employees | 93 |
| Plant Area |
n/a
|
| Annual Production | 600,000
pieces
|
| Production Hrs. Annual | 2,159
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $99,134 | 1,373,974 |
kWh
|
$0.072 |
| Natural Gas | $126,175 | 35,621 |
MMBtu
|
$3.54 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $28,378 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,356 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,480 | $6,000 |
$6,931
96,131
kWh
|
$(-1,451.0)
-
MMBtu
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,071 | $8,000 | - |
$6,071
-
MMBtu
|
- | |
| 03 | 2.1122: Re-size charging openings or add a movable door on equipment | $3,597 | $500 | - |
$3,597
-
MMBtu
|
- | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $2,273 | $5,000 | - |
$2,273
-
MMBtu
|
- | |
| 05 | 2.2163: Use minimum steam operating pressure | $775 | - | - |
$775
-
MMBtu
|
- | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $485 | - | - |
$545
-
MMBtu
|
$(-60.0) | |
| 07 | 2.2511: Insulate bare equipment | $2,648 | $5,000 | - |
$2,648
-
MMBtu
|
- | |
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,247 | $780 |
$1,247
17,292
kWh
|
- | - | |
| 09 | 2.2441: Preheat boiler makeup water with waste process heat | $4,871 | $6,700 | - |
$4,871
-
MMBtu
|
- | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $592 | $414 |
$592
8,206
kWh
|
- | - | |
| 11 | 2.2135: Repair and eliminate steam leaks | $191 | $200 | - |
$191
-
MMBtu
|
- | |
| 12 | 2.4312: Improve lubrication practices | $148 | $260 |
$148
2,052
kWh
|
- | - | |
| TOTAL RECOMMENDED | $28,378 | $32,854 |
$8,918
123,681
kWh
|
$19,520
-
MMBtu
|
$(-60.0) | ||
| TOTAL IMPLEMENTED | $14,356 | $15,394 |
$8,770
121,629
kWh
|
$5,586
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs