ITAC Assessment: KU0189
ITAC logo
ITAC Assessment: KU0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product RECON. STEEL DRUMS
NAICS
n/a
SIC 3412: Metal Shipping Barrels, Drums, Kegs, and Pails
Sales Range $5
M
to 10
M
# of Employees 93
Plant Area
n/a
Annual Production 600,000
pieces
Production Hrs. Annual 2,159
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,134 1,373,974
kWh
Natural Gas $126,175 35,621
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,378 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,356

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,480 $6,000 $6,931
96,131
kWh
$(-1,451.0)
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $6,071 $8,000 - $6,071
-
MMBtu
-
03 2.1122: Re-size charging openings or add a movable door on equipment $3,597 $500 - $3,597
-
MMBtu
-
04 2.2414: Use waste heat from hot flue gases to preheat $2,273 $5,000 - $2,273
-
MMBtu
-
05 2.2163: Use minimum steam operating pressure $775 - - $775
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $485 - - $545
-
MMBtu
$(-60.0)
07 2.2511: Insulate bare equipment $2,648 $5,000 - $2,648
-
MMBtu
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,247 $780 $1,247
17,292
kWh
- -
09 2.2441: Preheat boiler makeup water with waste process heat $4,871 $6,700 - $4,871
-
MMBtu
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $592 $414 $592
8,206
kWh
- -
11 2.2135: Repair and eliminate steam leaks $191 $200 - $191
-
MMBtu
-
12 2.4312: Improve lubrication practices $148 $260 $148
2,052
kWh
- -
TOTAL RECOMMENDED $28,378 $32,854 $8,918
123,681
kWh
$19,520
-
MMBtu
$(-60.0)
TOTAL IMPLEMENTED $14,356 $15,394 $8,770
121,629
kWh
$5,586
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs