Assessment Year | 2025 |
---|---|
Principal Product | Dump Bodies |
NAICS | 336120: Heavy Duty Truck Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $10 M to 50M |
# of Employees | 115 |
Plant Area |
200,000
ft2
|
Annual Production | 1,800
units
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $192,964 | 2,591,320 |
kWh
|
$0.074 | |
Electricity Demand | $90,380 | 5,713 |
kW-mo/yr
|
$15.82 | |
Natural Gas | $76,390 | 10,353 |
MMBtu
|
$7.38 | |
LPG | $22,721 | 714 |
MMBtu
|
$31.80 | |
Waste Disposal Costs | |||||
Water Usage | $1,448 | 2,027 |
Tgal
|
$0.71 | |
TOTAL YEARLY COSTS | $383,903 | ||||
RECOMMENDED SAVINGS* | $112,516 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | LPG Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $17,535 | $200,000 |
$(-5,185.9)
(-70,080)
kWh
|
- | - |
$22,721
-
MMBtu
|
|
02 | 2.7233: Use properly designed and sized hvac equipment | $8,629 | $44,500 |
$8,629
116,609
kWh
|
- | - | - | |
03 | 2.8114: Change rate schedules or other changes in utility service | $395 | - | - | $395 | - | - | |
04 | 2.7229: Air condition only space necessary | $40,482 | $25,536 |
$(-55.4)
(-749)
kWh
|
- |
$40,537
-
MMBtu
|
- | |
05 | 4.661: Level zero – install control systems for existing equipment | $12,178 | $45,000 | - | - |
$12,178
-
MMBtu
|
- | |
06 | 2.4323: Use optimum size and capacity equipment | $5,573 | $2,502 |
$5,573
77,740
kWh
|
- | - | - | |
07 | 2.4226: Use / purchase optimum sized compressor | $27,723 | $35,999 |
$27,723
372,624
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $112,516 | $353,537 |
$36,684
496,145
kWh
|
$395 |
$52,715
-
MMBtu
|
$22,721
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs