ITAC Assessment: MS0445
ITAC logo
ITAC Assessment: MS0445
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Dump Bodies
NAICS 336120: Heavy Duty Truck Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 200,000
ft2
Annual Production 1,800
units
Production Hrs. Annual 4,500
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,964 2,591,320
kWh
Electricity Demand $90,380 5,713
kW-mo/yr
Natural Gas $76,390 10,353
MMBtu
LPG $22,721 714
MMBtu
Waste Disposal Costs
Water Usage $1,448 2,027
Tgal
TOTAL YEARLY COSTS $383,903
RECOMMENDED SAVINGS* $112,516 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings LPG Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $17,535 $200,000 $(-5,185.9)
(-70,080)
kWh
- - $22,721
-
MMBtu
02 2.7233: Use properly designed and sized hvac equipment $8,629 $44,500 $8,629
116,609
kWh
- - -
03 2.8114: Change rate schedules or other changes in utility service $395 - - $395 - -
04 2.7229: Air condition only space necessary $40,482 $25,536 $(-55.4)
(-749)
kWh
- $40,537
-
MMBtu
-
05 4.661: Level zero – install control systems for existing equipment $12,178 $45,000 - - $12,178
-
MMBtu
-
06 2.4323: Use optimum size and capacity equipment $5,573 $2,502 $5,573
77,740
kWh
- - -
07 2.4226: Use / purchase optimum sized compressor $27,723 $35,999 $27,723
372,624
kWh
- - -
TOTAL RECOMMENDED $112,516 $353,537 $36,684
496,145
kWh
$395 $52,715
-
MMBtu
$22,721
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs