ITAC Assessment: UM0150
ITAC logo
ITAC Assessment: UM0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Pnuematic Hand Tools
NAICS
n/a
SIC 3546: Power-Driven Handtools
Sales Range $10
M
to 50
M
# of Employees 121
Plant Area 90,000
ft2
Annual Production 8,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,872 2,530,481
kWh
Electricity Demand $77,245 7,488
kW-mo/yr
Electricity Fees $742 -
Natural Gas $14,857 2,722
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,714 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $680

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $1,828 $1,500 $410
62,134
kWh
$1,418
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $680 $300 $157
23,154
kWh
$523
-
kW-mo/yr
- - -
03 2.7111: Reduce illumination to minimum necessary levels $3,067 $880 $1,440
67,702
kWh
$1,627
-
kW-mo/yr
- - -
04 2.7243: Improve air circulation with destratification fans / other methods $3,923 $1,750 - - $3,923
-
MMBtu
- -
05 3.3128: Utilize other methods to remove contaminants $35,216 $50,000 - - - $34,110 $1,106
TOTAL RECOMMENDED $44,714 $54,430 $2,007
152,990
kWh
$3,568
-
kW-mo/yr
$3,923
-
MMBtu
$34,110 $1,106
TOTAL IMPLEMENTED $680 $300 $157
23,154
kWh
$523
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs