Assessment Year | 2009 |
---|---|
Principal Product | pharmaceutical |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
100,000
ft2
|
Annual Production | 10,000,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $135,757 | 1,295,520 |
kWh
|
$0.10 |
Electricity Demand | $27,233 | 2,934 |
kW-mo/yr
|
$9.28 |
Natural Gas | $9,415 | 2,721 |
MMBtu
|
$3.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $75,809 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,787 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $19,778 | $20,000 |
$18,713
207,792
kWh
|
$1,065
-
kW-mo/yr
|
- | |
02 | 2.6242: Minimize operation of equipment maintained in standby condition | $12,698 | $2,600 |
$12,521
119,246
kWh
|
$177
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,495 | $11,500 |
$9,824
93,566
kWh
|
$1,671
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,121 | $304 |
$3,574
34,041
kWh
|
$547
-
kW-mo/yr
|
- | |
05 | 3.4111: Use closed cycle process to minimize waste water production | $3,908 | $12,000 | - | - | $3,908 | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,888 | $2,824 |
$3,324
31,653
kWh
|
$564
-
kW-mo/yr
|
- | |
07 | 2.9112: Use solar heat to heat water | $1,380 | $3,640 |
$930
8,857
kWh
|
$450
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,474 | $16,830 |
$7,590
71,575
kWh
|
$1,884
-
kW-mo/yr
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,333 | $6,137 |
$1,615
15,088
kWh
|
$718
-
kW-mo/yr
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,734 | $18,122 |
$5,769
54,051
kWh
|
$965
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $75,809 | $93,957 |
$63,860
635,869
kWh
|
$8,041
-
kW-mo/yr
|
$3,908 | ||
TOTAL IMPLEMENTED | $27,787 | $23,128 |
$25,611
273,486
kWh
|
$2,176
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs