ITAC Assessment: LE0289
ITAC logo
ITAC Assessment: LE0289
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product pharmaceutical
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 100,000
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,757 1,295,520
kWh
Electricity Demand $27,233 2,934
kW-mo/yr
Natural Gas $9,415 2,721
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,809 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,787

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $19,778 $20,000 $18,713
207,792
kWh
$1,065
-
kW-mo/yr
-
02 2.6242: Minimize operation of equipment maintained in standby condition $12,698 $2,600 $12,521
119,246
kWh
$177
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,495 $11,500 $9,824
93,566
kWh
$1,671
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,121 $304 $3,574
34,041
kWh
$547
-
kW-mo/yr
-
05 3.4111: Use closed cycle process to minimize waste water production $3,908 $12,000 - - $3,908
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,888 $2,824 $3,324
31,653
kWh
$564
-
kW-mo/yr
-
07 2.9112: Use solar heat to heat water $1,380 $3,640 $930
8,857
kWh
$450
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $9,474 $16,830 $7,590
71,575
kWh
$1,884
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,333 $6,137 $1,615
15,088
kWh
$718
-
kW-mo/yr
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $6,734 $18,122 $5,769
54,051
kWh
$965
-
kW-mo/yr
-
TOTAL RECOMMENDED $75,809 $93,957 $63,860
635,869
kWh
$8,041
-
kW-mo/yr
$3,908
TOTAL IMPLEMENTED $27,787 $23,128 $25,611
273,486
kWh
$2,176
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings