ITAC Assessment: SU0173
ITAC logo
ITAC Assessment: SU0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Nutritional/Diet Bars
NAICS 311352: Confectionery Manufacturing from Purchased Chocolate
SIC 2064: Candy and Other Confectionery Products
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area 61,600
ft2
Annual Production 70,000,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,850 1,512,900
kWh
Electricity Demand $37,863 3,606
kW-mo/yr
Electricity Fees $16,968 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,256 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,920

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.3134: Shift from daytime to nighttime operation $13,244 - - - - $13,244
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,991 - $2,882
41,170
kWh
$1,109
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $919 $57 $756
10,800
kWh
$163
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $1,102 $117 $797
11,384
kWh
$305
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $3,444 $4,290 $1,846
26,374
kWh
$1,598
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,001 $9,164 $3,171
45,302
kWh
$1,830
-
kW-mo/yr
- -
07 2.7232: Replace existing hvac unit with high efficiency model $9,555 $48,418 $2,869
40,988
kWh
$3,311
-
kW-mo/yr
$3,375 -
TOTAL RECOMMENDED $37,256 $62,046 $12,321
176,018
kWh
$8,316
-
kW-mo/yr
$3,375 $13,244
TOTAL IMPLEMENTED $5,920 $9,221 $3,927
56,102
kWh
$1,993
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs