ITAC Assessment: UU0271
ITAC logo
ITAC Assessment: UU0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Image Generators
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 134
Plant Area 113,000
ft2
Annual Production 125
units
Production Hrs. Annual 2,080
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,467 2,309,708
kWh
Electricity Demand $49,601 4,210
kW-mo/yr
Electricity Fees $68,175 -
Natural Gas $37,660 3,355
MMBtu
Waste Disposal Costs
Water Usage $23,355 3,882
Tgal
Water Disposal $19,062 1,848
Tgal
TOTAL YEARLY COSTS $282,319
RECOMMENDED SAVINGS* $16,849 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Administrative Changes Savings
01 2.2611: Moderate cooling tower outlet temperature $3,038 $1,248 $2,092
57,201
kWh
$946
-
kW-mo/yr
- -
02 2.2625: Chill water to the highest temperature possible $133 $1,175 $133
3,630
kWh
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,296 $11,327 $3,296
90,133
kWh
- - -
04 3.4151: Minimize water usage $3,231 $23,282 - - $3,231
-
Tgal
-
05 3.4154: Eliminate leaks in water lines and valves $771 $5,877 - - $771
-
Tgal
-
06 2.8121: Apply for tax-free status for energy purchases $6,046 $20,000 - - - $6,046
07 2.4239: Eliminate or reduce compressed air usage $335 $648 $211
5,761
kWh
$124
-
kW-mo/yr
- -
TOTAL RECOMMENDED $16,849 $63,557 $5,731
156,725
kWh
$1,070
-
kW-mo/yr
$4,002
-
Tgal
$6,046
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs