ITAC Assessment: UL2507
ITAC logo
ITAC Assessment: UL2507
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Thermoplastic Resins
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $100
M
to 500
M
# of Employees 103
Plant Area 220,000
ft2
Annual Production 210,000,000
lb
Production Hrs. Annual 4,992
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,312,657 29,778,960
kWh
Electricity Demand $899,526 52,913
kW-mo/yr
Electricity Fees $206,354 -
Natural Gas $13,462 1,650
MMBtu
TOTAL YEARLY COSTS $2,431,999
RECOMMENDED SAVINGS* $84,437 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $56,773 $527,158 $33,522
760,496
kWh
$23,251
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,632 $24,675 $11,632
263,886
kWh
-
03 2.2692: Use outside cold water source as a supply of cooling water $16,032 $37,000 $8,312
188,913
kWh
$7,720
-
kW-mo/yr
TOTAL RECOMMENDED $84,437 $588,833 $53,466
1,213,295
kWh
$30,971
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs