ITAC Assessment: SD0676
ITAC logo
ITAC Assessment: SD0676
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Metal Treatment
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $5
M
to 10
M
# of Employees 34
Plant Area 64,000
ft2
Annual Production 400
units
Production Hrs. Annual 3,188
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $586,685 3,704,765
kWh
Electricity Demand $734,855 12,932
kW-mo/yr
Electricity Fees $(-535,389.0) -
TOTAL YEARLY COSTS $786,151
RECOMMENDED SAVINGS* $513,478 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Raw Material Savings
01 2.9114: Use solar heat to make electricty $35,908 $47,771 $14,674
92,642
kWh
$21,234
-
kW-mo/yr
- -
02 2.3141: Use battery storage for demand control $109,396 $5,254 $(-6,370.0)
(-40,212)
kWh
$115,766
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,618 $1,911 $1,114
7,032
kWh
$1,504
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $39,510 $44,993 $31,109
196,395
kWh
$8,401
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,805 - $1,805
11,397
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,821 $7,047 $5,880
37,119
kWh
$7,941
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,684 $2,699 $1,315
8,300
kWh
$369
-
kW-mo/yr
- -
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $143,491 - - - $143,491 -
09 2.2628: Utilize a less expensive cooling method $153,587 $200,000 - - - $153,587
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,179 $8,868 $6,455
40,748
kWh
$2,724
-
kW-mo/yr
- -
11 2.4225: Install common header on compressors $2,478 $2,050 $1,326
8,368
kWh
$1,153
-
kW-mo/yr
- -
TOTAL RECOMMENDED $513,478 $320,593 $57,307
361,789
kWh
$159,093
-
kW-mo/yr
$143,491 $153,587
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs