| Assessment Year | 2025 |
|---|---|
| Principal Product | Metal Treatment |
| NAICS | 332811: Metal Heat Treating |
| SIC | 3398: Metal Heat Treating |
| Sales Range | $5 M to 10M |
| # of Employees | 34 |
| Plant Area |
64,000
ft2
|
| Annual Production | 400
units
|
| Production Hrs. Annual | 3,188
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $586,685 | 3,704,765 |
kWh
|
$0.16 |
| Electricity Demand | $734,855 | 12,932 |
kW-mo/yr
|
$56.82 |
| Electricity Fees | $(-535,389.0) | - |
|
- |
| TOTAL YEARLY COSTS | $786,151 | |||
| RECOMMENDED SAVINGS* | $513,478 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $35,908 | $47,771 |
$14,674
92,642
kWh
|
$21,234
-
kW-mo/yr
|
- | - | |
| 02 | 2.3141: Use battery storage for demand control | $109,396 | $5,254 |
$(-6,370.0)
(-40,212)
kWh
|
$115,766
-
kW-mo/yr
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,618 | $1,911 |
$1,114
7,032
kWh
|
$1,504
-
kW-mo/yr
|
- | - | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $39,510 | $44,993 |
$31,109
196,395
kWh
|
$8,401
-
kW-mo/yr
|
- | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,805 | - |
$1,805
11,397
kWh
|
- | - | - | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,821 | $7,047 |
$5,880
37,119
kWh
|
$7,941
-
kW-mo/yr
|
- | - | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,684 | $2,699 |
$1,315
8,300
kWh
|
$369
-
kW-mo/yr
|
- | - | |
| 08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $143,491 | - | - | - | $143,491 | - | |
| 09 | 2.2628: Utilize a less expensive cooling method | $153,587 | $200,000 | - | - | - | $153,587 | |
| 10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,179 | $8,868 |
$6,455
40,748
kWh
|
$2,724
-
kW-mo/yr
|
- | - | |
| 11 | 2.4225: Install common header on compressors | $2,478 | $2,050 |
$1,326
8,368
kWh
|
$1,153
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $513,478 | $320,593 |
$57,307
361,789
kWh
|
$159,093
-
kW-mo/yr
|
$143,491 | $153,587 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs