ITAC Assessment: WM0009
ITAC logo
ITAC Assessment: WM0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Traffic and Parking Safety products and Accessories
NAICS 339950: Sign Manufacturing
SIC 3993: Signs and Advertising Specialties
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 128,000
ft2
Annual Production 40,000
pieces
Production Hrs. Annual 2,553
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,480 1,132,864
kWh
Electricity Demand $43,764 3,855
kW-mo/yr
Electricity Fees $16,167 -
Natural Gas $19,776 2,454
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,680 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,421

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7135: Install occupancy sensors $1,062 $660 $1,062
15,945
kWh
- - -
02 2.7124: Make a practice of turning off lights when not needed $167 $60 $167
2,507
kWh
- - -
03 2.7231: Use radiant heater for spot heating $3,162 $2,448 - - $3,162
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $259 $200 $259
3,885
kWh
- - -
05 3.1171: Change product specs $11,780 - - - - $11,780
-
lb
06 2.7233: Use properly designed and sized hvac equipment $12,250 $19,000 $10,574
158,703
kWh
$1,676
-
kW-mo/yr
- -
TOTAL RECOMMENDED $28,680 $22,368 $12,062
181,040
kWh
$1,676
-
kW-mo/yr
$3,162
-
MMBtu
$11,780
-
lb
TOTAL IMPLEMENTED $3,421 $2,648 $259
3,885
kWh
- $3,162
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs