ITAC Assessment: SU0295
ITAC logo
ITAC Assessment: SU0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Tomato Based Sauces and Salsas
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 225,000
ft2
Annual Production 357,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $308,145 13,757,400
kWh
Electricity Demand $128,772 25,754
kW-mo/yr
Natural Gas $1,508,554 221,309
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $650,187 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $647,275

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,574 - $2,574
117,000
kWh
- - - -
02 2.4322: Use or replace with energy efficient substitutes $1,022 - $422
19,200
kWh
$600
-
kW-mo/yr
- - -
03 3.4114: Replace city water with recycled water via cooling tower $595,177 $272,656 $(-15,762.0)
(-716,400)
kWh
$(-7,170.0)
-
kW-mo/yr
- $274,715
-
Tgal
$343,394
-
gal
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,178 $1,225 $2,178
99,000
kWh
- - - -
05 2.2414: Use waste heat from hot flue gases to preheat $29,403 $27,649 - - $29,403
-
MMBtu
- -
06 2.4221: Install compressor air intakes in coolest locations $1,800 $1,649 $1,800
81,840
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $17,943 $74,298 $13,683
621,960
kWh
$4,260
-
kW-mo/yr
- - -
08 2.6211: Conserve energy by efficient use of vending machines $90 $724 $90
4,146
kWh
- - - -
TOTAL RECOMMENDED $650,187 $378,201 $4,985
226,746
kWh
$(-2,310.0)
-
kW-mo/yr
$29,403
-
MMBtu
$274,715
-
Tgal
$343,394
-
gal
TOTAL IMPLEMENTED $647,275 $375,828 $2,673
121,560
kWh
$(-2,910.0)
-
kW-mo/yr
$29,403
-
MMBtu
$274,715
-
Tgal
$343,394
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs