ITAC Assessment: IC0235
ITAC logo
ITAC Assessment: IC0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Metal Display Units
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 135,000
ft2
Annual Production 300,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,104 2,641,635
kWh
Electricity Demand $97,456 7,022
kW-mo/yr
Electricity Fees $(-4,782.0) -
TOTAL YEARLY COSTS $227,778
RECOMMENDED SAVINGS* $37,939 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $28,357 $32,486 $21,904
322,122
kWh
$6,453
-
kW-mo/yr
02 2.7135: Install occupancy sensors $1,398 $3,402 $1,398
20,577
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $3,555 $1,224 $2,708
39,818
kWh
$848
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,628 - $3,525
51,837
kWh
$1,103
-
kW-mo/yr
TOTAL RECOMMENDED $37,939 $37,112 $29,535
434,354
kWh
$8,404
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -