ITAC Assessment: GT0362
ITAC logo
ITAC Assessment: GT0362
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PROCESSED CHICKEN PARTS
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $50
M
to 100
M
# of Employees 430
Plant Area
n/a
Annual Production 27,436,600
lb
Production Hrs. Annual 8,400
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $230,616 5,602,579
kWh
Natural Gas $205,750 40,203
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,353 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,493

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $8,860 $9,000 - $8,860
-
MMBtu
02 2.2113: Repair or replace steam traps $5,850 $250 - $5,850
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $2,770 $2,770 - $2,770
-
MMBtu
04 2.4322: Use or replace with energy efficient substitutes $2,800 $8,200 - $2,800
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,340 $3,300 $1,340
32,532
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $10,500 $3,500 - $10,500
-
MMBtu
07 2.4133: Use most efficient type of electric motors $215 $146 $215
4,982
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $18 - $18
586
kWh
-
TOTAL RECOMMENDED $32,353 $27,166 $1,573
38,100
kWh
$30,780
-
MMBtu
TOTAL IMPLEMENTED $23,493 $18,166 $1,573
38,100
kWh
$21,920
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs