ITAC Assessment: SF0474
ITAC logo
ITAC Assessment: SF0474
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Wines
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 95,000
ft2
Annual Production 2,000,000
units
Production Hrs. Annual 2,895
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $442,602 2,927,638
kWh
Natural Gas $102,666 10,484
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $160,170 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $91,025

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.6218: Turn off equipment when not in use $1,699 - $1,699
11,239
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,169 - $2,589
17,122
kWh
- $(-420.0) -
03 2.7224: Reduce space conditioning during non-working hours $37,843 - $32,743
216,585
kWh
$5,100
-
MMBtu
- -
04 2.6231: Utilize controls to operate equipment only when needed $26,501 $5,010 $26,501
175,296
kWh
- - -
05 2.2621: Modify refrigeration system to operate at a lower pressure $60,323 $13,006 $60,323
399,016
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,400 $6,155 $4,400
29,103
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $11,353 $39,333 $6,698
44,304
kWh
- $1,507 $3,148
08 2.7135: Install occupancy sensors $1,240 $4,506 $1,240
8,200
kWh
- - -
09 2.2511: Insulate bare equipment $7,582 $31,836 $7,582
50,153
kWh
- - -
10 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,060 $29,463 $7,060
46,701
kWh
- - -
TOTAL RECOMMENDED $160,170 $129,309 $150,835
997,719
kWh
$5,100
-
MMBtu
$1,087 $3,148
TOTAL IMPLEMENTED $91,025 $79,961 $81,690
540,350
kWh
$5,100
-
MMBtu
$1,087 $3,148
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs