ITAC Assessment: WV0684
ITAC logo
ITAC Assessment: WV0684
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Vitamins and nutritional products
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2076: Vegetable Oil Mills, Except Corn, Cottonseed, and Soybean
Sales Range $50
M
to 100
M
# of Employees 55
Plant Area 53,000
ft2
Annual Production 111,818
lb
Production Hrs. Annual 3,060
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $362,175 3,963,042
kWh
Electricity Demand $46,295 8,589
kW-mo/yr
Electricity Fees $133,261 -
Waste Disposal Costs
Water Usage $17,477 5,454
Tgal
Water Disposal $25,882 5,454
Tgal
TOTAL YEARLY COSTS $585,090
RECOMMENDED SAVINGS* $56,264 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
01 2.7314: Reduce ventilation air $35,325 $5,420 $28,690
313,900
kWh
$6,635
-
kW-mo/yr
-
02 2.7226: Use computer programs to optimize hvac performance $5,930 $12,005 $4,814
52,670
kWh
$1,116
-
kW-mo/yr
-
03 2.4224: Upgrade controls on compressors $3,312 $5,557 $2,999
32,673
kWh
$313
-
kW-mo/yr
-
04 2.7245: Use direct air supply to exhaust hoods $2,894 $6,400 $2,350
25,711
kWh
$544
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,760 $7,928 $2,555
27,949
kWh
$205
-
kW-mo/yr
-
06 2.1336: Install equipment to utilize waste fuel $2,729 $3,800 $2,217
24,251
kWh
$512
-
kW-mo/yr
-
07 2.2449: Recover heat from exhausted steam, hot air or hot water $1,711 $5,800 $1,313
14,362
kWh
$302
-
kW-mo/yr
$96
08 2.2625: Chill water to the highest temperature possible $866 $1,550 $704
7,705
kWh
$162
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $458 $1,800 $361
3,932
kWh
$97
-
kW-mo/yr
-
10 2.2511: Insulate bare equipment $279 $153 $225
2,462
kWh
$54
-
kW-mo/yr
-
TOTAL RECOMMENDED $56,264 $50,413 $46,228
505,615
kWh
$9,940
-
kW-mo/yr
$96
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs