Assessment Year | 2025 |
---|---|
Principal Product | Vitamins and nutritional products |
NAICS | 311999: All Other Miscellaneous Food Manufacturing |
SIC | 2076: Vegetable Oil Mills, Except Corn, Cottonseed, and Soybean |
Sales Range | $50 M to 100M |
# of Employees | 55 |
Plant Area |
53,000
ft2
|
Annual Production | 111,818
lb
|
Production Hrs. Annual | 3,060
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $362,175 | 3,963,042 |
kWh
|
$0.091 | |
Electricity Demand | $46,295 | 8,589 |
kW-mo/yr
|
$5.39 | |
Electricity Fees | $133,261 | - |
|
- | |
Waste Disposal Costs | |||||
Water Usage | $17,477 | 5,454 |
Tgal
|
$3.20 | |
Water Disposal | $25,882 | 5,454 |
Tgal
|
$4.75 | |
TOTAL YEARLY COSTS | $585,090 | ||||
RECOMMENDED SAVINGS* | $56,264 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|
01 | 2.7314: Reduce ventilation air | $35,325 | $5,420 |
$28,690
313,900
kWh
|
$6,635
-
kW-mo/yr
|
- | |
02 | 2.7226: Use computer programs to optimize hvac performance | $5,930 | $12,005 |
$4,814
52,670
kWh
|
$1,116
-
kW-mo/yr
|
- | |
03 | 2.4224: Upgrade controls on compressors | $3,312 | $5,557 |
$2,999
32,673
kWh
|
$313
-
kW-mo/yr
|
- | |
04 | 2.7245: Use direct air supply to exhaust hoods | $2,894 | $6,400 |
$2,350
25,711
kWh
|
$544
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,760 | $7,928 |
$2,555
27,949
kWh
|
$205
-
kW-mo/yr
|
- | |
06 | 2.1336: Install equipment to utilize waste fuel | $2,729 | $3,800 |
$2,217
24,251
kWh
|
$512
-
kW-mo/yr
|
- | |
07 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $1,711 | $5,800 |
$1,313
14,362
kWh
|
$302
-
kW-mo/yr
|
$96 | |
08 | 2.2625: Chill water to the highest temperature possible | $866 | $1,550 |
$704
7,705
kWh
|
$162
-
kW-mo/yr
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $458 | $1,800 |
$361
3,932
kWh
|
$97
-
kW-mo/yr
|
- | |
10 | 2.2511: Insulate bare equipment | $279 | $153 |
$225
2,462
kWh
|
$54
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $56,264 | $50,413 |
$46,228
505,615
kWh
|
$9,940
-
kW-mo/yr
|
$96 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs