ITAC Assessment: GT0977
ITAC logo
ITAC Assessment: GT0977
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Automotive Transfer Cases/Batteries
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range greater than $500
M
# of Employees 950
Plant Area 350,000
ft2
Annual Production 1,507,000
units
Production Hrs. Annual 8,760
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,644,333 21,751,456
kWh
Natural Gas $131,765 15,467
MMBtu
TOTAL YEARLY COSTS $1,776,098
RECOMMENDED SAVINGS* $181,528 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $108,930

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $85,518 $1,850 $88,418
1,163,393
kWh
$(-2,900.0)
02 2.6218: Turn off equipment when not in use $1,957 $1,500 $1,957
25,754
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,128 $14,000 $15,128
199,056
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $6,327 $12,892 $6,327
83,255
kWh
-
05 2.9114: Use solar heat to make electricty $72,598 $1,299,381 $72,598
960,131
kWh
-
TOTAL RECOMMENDED $181,528 $1,329,623 $184,428
2,431,589
kWh
$(-2,900.0)
TOTAL IMPLEMENTED $108,930 $30,242 $111,830
1,471,458
kWh
$(-2,900.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs