Assessment Year | 2024 |
---|---|
Principal Product | Automotive Transfer Cases/Batteries |
NAICS | 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | greater than $500 M |
# of Employees | 950 |
Plant Area |
350,000
ft2
|
Annual Production | 1,507,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,644,333 | 21,751,456 |
kWh
|
$0.076 |
Natural Gas | $131,765 | 15,467 |
MMBtu
|
$8.52 |
TOTAL YEARLY COSTS | $1,776,098 | |||
RECOMMENDED SAVINGS* | $181,528 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $108,930 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $85,518 | $1,850 |
$88,418
1,163,393
kWh
|
$(-2,900.0) | |
02 | 2.6218: Turn off equipment when not in use | $1,957 | $1,500 |
$1,957
25,754
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,128 | $14,000 |
$15,128
199,056
kWh
|
- | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $6,327 | $12,892 |
$6,327
83,255
kWh
|
- | |
05 | 2.9114: Use solar heat to make electricty | $72,598 | $1,299,381 |
$72,598
960,131
kWh
|
- | |
TOTAL RECOMMENDED | $181,528 | $1,329,623 |
$184,428
2,431,589
kWh
|
$(-2,900.0) | ||
TOTAL IMPLEMENTED | $108,930 | $30,242 |
$111,830
1,471,458
kWh
|
$(-2,900.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs