ITAC Assessment: MA0149
ITAC logo
ITAC Assessment: MA0149
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product FACE BRICKS
NAICS
n/a
SIC 3251: Brick and Structural Clay Tile
Sales Range $5
M
to 10
M
# of Employees 52
Plant Area
n/a
Annual Production 35,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $249,388 2,491,208
kWh
LPG $213,798 39,325
MMBtu
Fuel Oil #2 $403,282 110,705
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,959 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $49,355 $58,020 $(-5,420.0)
(-54,220)
kWh
$54,775
-
MMBtu
02 2.6218: Turn off equipment when not in use $6,037 - $1,261
12,603
kWh
$4,776
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $996 $230 $996
9,965
kWh
-
04 2.4133: Use most efficient type of electric motors $3,305 $1,160 $3,305
33,118
kWh
-
05 2.4239: Eliminate or reduce compressed air usage $266 $225 $266
2,638
kWh
-
TOTAL RECOMMENDED $59,959 $59,635 $408
4,104
kWh
$59,551
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs