ITAC Assessment: UA0081
ITAC logo
ITAC Assessment: UA0081
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Chicken Processing
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 100,000
ft2
Annual Production 260,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $675,858 11,138,216
kWh
Electricity Demand $128,587 23,787
kW-mo/yr
Natural Gas $1,384,302 255,810
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,439 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,778

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $26,860 $38,323 $22,928
377,849
kWh
$3,249
-
kW-mo/yr
$683 -
02 2.7135: Install occupancy sensors $1,632 $1,609 $1,590
25,607
kWh
- $42 -
03 2.2136: Install / repair insulation on steam lines $24,682 $6,975 - - $543 $24,139
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $13,459 $480 $11,347
186,990
kWh
$1,770
-
kW-mo/yr
$342 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,206 $5,100 $9,708
159,987
kWh
$1,213
-
kW-mo/yr
$285 -
06 2.7261: Install timers and/or thermostats $2,481 $2,210 $2,418
39,394
kWh
- $63 -
07 3.1161: Eliminate/reduce an operation $119 $85 $103
1,692
kWh
$13
-
kW-mo/yr
$3 -
TOTAL RECOMMENDED $80,439 $54,782 $48,094
791,519
kWh
$6,245
-
kW-mo/yr
$1,961 $24,139
-
MMBtu
TOTAL IMPLEMENTED $28,778 $9,399 $25,063
411,978
kWh
$2,983
-
kW-mo/yr
$732 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs