ITAC Assessment: UF0631
ITAC logo
ITAC Assessment: UF0631
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Turbine Blades
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 64,000
ft2
Annual Production 180,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,767 2,872,479
kWh
Electricity Demand $178,672 9,709
kW-mo/yr
Electricity Fees $45,285 -
Natural Gas $13,317 779
MMBtu
TOTAL YEARLY COSTS $365,041
RECOMMENDED SAVINGS* $192,439 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $45,516 $322,608 $27,849
632,923
kWh
$17,667
-
kW-mo/yr
-
02 2.3191: Use demand controller or load shedder $30,505 $15,454 $12,639
287,248
kWh
$17,866
-
kW-mo/yr
-
03 2.6231: Utilize controls to operate equipment only when needed $2,030 $500 $2,030
46,141
kWh
- -
04 2.2623: Minimize condenser cooling water temperature $1,216 $4,665 $1,216
27,641
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,201 - $1,201
27,300
kWh
- -
06 2.4224: Upgrade controls on compressors $1,095 $4,000 $1,095
24,879
kWh
- -
07 4.424: Improve space comfort conditioning $65,876 $2,873 $(-1,211.0)
(-27,520)
kWh
$(-1,163.0)
-
kW-mo/yr
$68,250
08 4.652: Replace existing equipment with more suitable substitutes $45,000 $1,900 - - $45,000
TOTAL RECOMMENDED $192,439 $352,000 $44,819
1,018,612
kWh
$34,370
-
kW-mo/yr
$113,250
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs