ITAC Assessment: SF0205
ITAC logo
ITAC Assessment: SF0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product HDPE Bottles
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 50,000
ft2
Annual Production 94,000,000
units
Production Hrs. Annual 6,936
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $425,439 5,010,240
kWh
Natural Gas $27,653 4,218
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,591 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,937

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.2691: Shut off cooling if cold outside air will cool process $2,248 - $2,248
26,534
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $1,267 $781 $1,267
14,960
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,398 $1,128 $1,398
16,396
kWh
-
04 2.2511: Insulate bare equipment $4,536 $4,508 $4,536
53,547
kWh
-
05 2.4133: Use most efficient type of electric motors $8,404 $9,230 $8,404
99,208
kWh
-
06 2.7135: Install occupancy sensors $1,007 $1,080 $1,007
11,888
kWh
-
07 2.7132: Install timers on light switches in little used areas $568 $750 $568
6,700
kWh
-
08 2.7135: Install occupancy sensors $4,509 $7,290 $4,509
53,227
kWh
-
09 2.7145: Install skylights $8,242 $23,962 $8,242
97,280
kWh
-
10 2.3212: Optimize plant power factor $3,666 $5,428 - $3,666
11 2.8114: Change rate schedules or other changes in utility service $48,746 $120,000 - $48,746
TOTAL RECOMMENDED $84,591 $174,157 $32,179
379,740
kWh
$52,412
TOTAL IMPLEMENTED $23,937 $24,767 $23,937
282,460
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs