Assessment Year | 2024 |
---|---|
Principal Product | Electric Motors |
NAICS | 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing |
SIC | 3621: Motors and Generators |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
111,400
ft2
|
Annual Production | 3,000
units
|
Production Hrs. Annual | 4,200
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $236,172 | 2,095,800 |
kWh
|
$0.11 |
Electricity Demand | $37,449 | 5,879 |
kW-mo/yr
|
$6.37 |
Electricity Fees | $1,944 | - |
|
- |
Natural Gas | $26,189 | 3,942 |
MMBtu
|
$6.64 |
TOTAL YEARLY COSTS | $301,754 | |||
RECOMMENDED SAVINGS* | $104,234 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $55,596 | $232,663 |
$36,578
321,987
kWh
|
$11,721
-
kW-mo/yr
|
$7,297
-
MMBtu
|
- | |
02 | 2.7241: Install outside air damper / economizer on hvac unit | $20,643 | $75,157 |
$19,101
168,145
kWh
|
$1,542
-
kW-mo/yr
|
- | - | |
03 | 2.7135: Install occupancy sensors | $6,139 | $11,569 |
$5,151
45,340
kWh
|
$988
-
kW-mo/yr
|
- | - | |
04 | 2.4323: Use optimum size and capacity equipment | $5,359 | $6,620 |
$4,620
40,670
kWh
|
$739
-
kW-mo/yr
|
- | - | |
05 | 2.2511: Insulate bare equipment | $4,399 | $2,317 |
$3,794
33,402
kWh
|
$605
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,382 | $16,575 |
$3,732
32,856
kWh
|
$650
-
kW-mo/yr
|
- | - | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,917 | $5,832 |
$113
995
kWh
|
$6
-
kW-mo/yr
|
$2,830
-
MMBtu
|
$(-32.0) | |
08 | 2.2625: Chill water to the highest temperature possible | $2,740 | $1,420 |
$2,364
20,813
kWh
|
$376
-
kW-mo/yr
|
- | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $620 | $560 |
$534
4,700
kWh
|
$86
-
kW-mo/yr
|
- | - | |
10 | 2.4224: Upgrade controls on compressors | $613 | $3,000 |
$530
4,669
kWh
|
$83
-
kW-mo/yr
|
- | - | |
11 | 2.4239: Eliminate or reduce compressed air usage | $470 | $887 |
$406
3,576
kWh
|
$64
-
kW-mo/yr
|
- | - | |
12 | 2.4231: Reduce the pressure of compressed air to the minimum required | $179 | $80 |
$154
1,353
kWh
|
$25
-
kW-mo/yr
|
- | - | |
13 | 2.4221: Install compressor air intakes in coolest locations | $177 | $688 |
$152
1,341
kWh
|
$25
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $104,234 | $357,368 |
$77,229
679,847
kWh
|
$16,910
-
kW-mo/yr
|
$10,127
-
MMBtu
|
$(-32.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs