ITAC Assessment: WV0673
ITAC logo
ITAC Assessment: WV0673
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Electric Motors
NAICS 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 111,400
ft2
Annual Production 3,000
units
Production Hrs. Annual 4,200
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $236,172 2,095,800
kWh
Electricity Demand $37,449 5,879
kW-mo/yr
Electricity Fees $1,944 -
Natural Gas $26,189 3,942
MMBtu
TOTAL YEARLY COSTS $301,754
RECOMMENDED SAVINGS* $104,234 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7232: Replace existing hvac unit with high efficiency model $55,596 $232,663 $36,578
321,987
kWh
$11,721
-
kW-mo/yr
$7,297
-
MMBtu
-
02 2.7241: Install outside air damper / economizer on hvac unit $20,643 $75,157 $19,101
168,145
kWh
$1,542
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $6,139 $11,569 $5,151
45,340
kWh
$988
-
kW-mo/yr
- -
04 2.4323: Use optimum size and capacity equipment $5,359 $6,620 $4,620
40,670
kWh
$739
-
kW-mo/yr
- -
05 2.2511: Insulate bare equipment $4,399 $2,317 $3,794
33,402
kWh
$605
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,382 $16,575 $3,732
32,856
kWh
$650
-
kW-mo/yr
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $2,917 $5,832 $113
995
kWh
$6
-
kW-mo/yr
$2,830
-
MMBtu
$(-32.0)
08 2.2625: Chill water to the highest temperature possible $2,740 $1,420 $2,364
20,813
kWh
$376
-
kW-mo/yr
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $620 $560 $534
4,700
kWh
$86
-
kW-mo/yr
- -
10 2.4224: Upgrade controls on compressors $613 $3,000 $530
4,669
kWh
$83
-
kW-mo/yr
- -
11 2.4239: Eliminate or reduce compressed air usage $470 $887 $406
3,576
kWh
$64
-
kW-mo/yr
- -
12 2.4231: Reduce the pressure of compressed air to the minimum required $179 $80 $154
1,353
kWh
$25
-
kW-mo/yr
- -
13 2.4221: Install compressor air intakes in coolest locations $177 $688 $152
1,341
kWh
$25
-
kW-mo/yr
- -
TOTAL RECOMMENDED $104,234 $357,368 $77,229
679,847
kWh
$16,910
-
kW-mo/yr
$10,127
-
MMBtu
$(-32.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs