ITAC Assessment: IA0035
ITAC logo
ITAC Assessment: IA0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product AUTO AND INDUSTRIAL HOSES
NAICS
n/a
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 146,000
thousand feet
Production Hrs. Annual 8,320
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $268,528 5,760,258
kWh
Natural Gas $73,396 21,469
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,904 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,976

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,075 $743 $3,387
72,685
kWh
- $(-312.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,061 $1,705 $4,061
87,046
kWh
- -
03 2.6232: Install set-back timers $1,990 $2,313 $1,990
42,790
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $127 $200 $127
2,638
kWh
- -
05 2.1213: Direct warmest air to combustion intake $928 $710 - $928
-
MMBtu
-
06 2.7261: Install timers and/or thermostats $723 $600 - $723
-
MMBtu
-
TOTAL RECOMMENDED $10,904 $6,271 $9,565
205,159
kWh
$1,651
-
MMBtu
$(-312.0)
TOTAL IMPLEMENTED $9,976 $5,561 $9,565
205,159
kWh
$723
-
MMBtu
$(-312.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs