ITAC Assessment: AM0568
ITAC logo
ITAC Assessment: AM0568
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Cardboard boxes
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 285,000
ft2
Annual Production 240,000
thousand feet
Production Hrs. Annual 2,520
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $339,777 3,649,389
kWh
Electricity Demand $77,301 15,276
kW-mo/yr
Electricity Fees $1,710 -
Natural Gas $80,418 20,163
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $150,437 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $55,000 $46,000 - - $55,000
-
MMBtu
- - -
02 3.5313: Increase amount of waste recovered for resale $43,900 - - - - - - $43,900
03 2.3212: Optimize plant power factor $22,400 $54,380 - $22,400
-
kW-mo/yr
- - - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $6,780 $500 - - $6,780
-
MMBtu
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,655 $2,000 $5,175
57,900
kWh
$1,480
-
kW-mo/yr
- - - -
06 2.7145: Install skylights $4,820 $13,100 $5,270
59,000
kWh
- - $(-450.0) - -
07 2.2113: Repair or replace steam traps $2,920 $1,845 - - $2,920
-
MMBtu
- - -
08 2.4133: Use most efficient type of electric motors $2,340 $9,176 $1,750
19,500
kWh
$590
-
kW-mo/yr
- - - -
09 2.6212: Turn off equipment during breaks, reduce operating time $2,330 - $2,330
26,100
kWh
- - - - -
10 4.821: Pay bills on time to avoid late fees $2,282 - - - - - $2,282 -
11 2.6218: Turn off equipment when not in use $1,010 - $1,010
11,300
kWh
- - - - -
TOTAL RECOMMENDED $150,437 $127,001 $15,535
173,800
kWh
$24,470
-
kW-mo/yr
$64,700
-
MMBtu
$(-450.0) $2,282 $43,900
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs