ITAC Assessment: IP0007
ITAC logo
ITAC Assessment: IP0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Durable Electronic Components
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 460
Plant Area 203,535
ft2
Annual Production 1,882,387
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $585,360 9,277,400
kWh
Electricity Demand $144,094 21,331
kW-mo/yr
Electricity Fees $41,230 -
Natural Gas $31,730 5,083
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,747 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,908

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,164 - $7,164
115,735
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,744 - $2,711
43,800
kWh
$33
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $13,528 $33,600 - - $13,528 -
04 2.7313: Recycle air for heating, ventilation and air conditioning $46,311 $151,951 $16,419
265,063
kWh
$534
-
kW-mo/yr
- $29,358
-
MMBtu
TOTAL RECOMMENDED $69,747 $185,551 $26,294
424,598
kWh
$567
-
kW-mo/yr
$13,528 $29,358
-
MMBtu
TOTAL IMPLEMENTED $9,908 - $9,875
159,535
kWh
$33
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs