ITAC Assessment: LE0601
ITAC logo
ITAC Assessment: LE0601
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product collagen casing
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $100
M
to 500
M
# of Employees 127
Plant Area 132,142
ft2
Annual Production 592,021,000
units
Production Hrs. Annual 4,368
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,454,221 12,362,093
kWh
Electricity Demand $148,361 23,756
kW-mo/yr
Electricity Fees $17,384 -
Natural Gas $675,218 202,404
MMBtu
TOTAL YEARLY COSTS $2,295,184
RECOMMENDED SAVINGS* $275,777 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $18,356 - $17,112
145,018
kWh
$1,244
-
kW-mo/yr
- -
02 2.7261: Install timers and/or thermostats $44,588 $1,600 $8,756
74,206
kWh
- $35,832
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,225 $3,680 $11,393
96,575
kWh
$832
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $55,828 $52,000 $52,053
441,110
kWh
$3,775
-
kW-mo/yr
- -
05 2.2614: Use cooling tower or economizer to replace chiller cooling $18,412 $23,182 $17,163
145,452
kWh
$1,249
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $636 $1,081 $636
5,385
kWh
- - -
07 2.9114: Use solar heat to make electricty $72,625 $210,000 $39,325
333,252
kWh
- - $33,300
08 2.7142: Utilize higher efficiency lamps and/or ballasts $12,248 $44,740 $10,360
87,799
kWh
$1,888
-
kW-mo/yr
- -
09 2.7232: Replace existing hvac unit with high efficiency model $40,859 $167,895 $38,090
322,795
kWh
$2,769
-
kW-mo/yr
- -
TOTAL RECOMMENDED $275,777 $504,178 $194,888
1,651,592
kWh
$11,757
-
kW-mo/yr
$35,832
-
MMBtu
$33,300
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs