ITAC Assessment: SU0552
ITAC logo
ITAC Assessment: SU0552
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Light Rail Vehicles
NAICS 336510: Railroad Rolling Stock Manufacturing
SIC 3743: Railroad Equipment
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 1,655,280
ft2
Annual Production 8
units
Production Hrs. Annual 2,340
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,455 1,650,868
kWh
Electricity Demand $51,662 5,285
kW-mo/yr
Electricity Fees $22,344 -
Natural Gas $289,179 31,080
MMBtu
LPG $11,435 473
MMBtu
Other Gas $46,641 1
MMBtu
Waste Disposal Costs
Water Usage $9,712 1,354
Tgal
Water Disposal $1,389 1,354
Tgal
Solid Waste (non-haz) $21,372 1,000
lb
TOTAL YEARLY COSTS $588,188
RECOMMENDED SAVINGS* $212,912 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $35,554 $220 - - $35,554
-
MMBtu
- -
02 4.821: Pay bills on time to avoid late fees $1,162 - - - - - $1,162
03 2.4239: Eliminate or reduce compressed air usage $6,891 - $6,891
85,079
kWh
- - - -
04 2.3132: Recharge batteries on during off-peak demand periods $7,179 - - $7,179
-
kW-mo/yr
- - -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,579 - - $2,579
-
kW-mo/yr
- - -
06 2.8121: Apply for tax-free status for energy purchases $13,486 $168 - - - - $13,486
07 2.4322: Use or replace with energy efficient substitutes $8,427 $212 $7,898
97,500
kWh
$4,399
-
kW-mo/yr
$(-3,869.0)
-
MMBtu
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,971 $224 $3,971
49,020
kWh
- - - -
09 2.7491: Insulate glazing, walls, ceilings, and roofs $33,762 $6,532 - - $33,762
-
MMBtu
- -
10 2.1121: Use insulation in furnaces to facilitate heating / cooling $466 $271 - - $466
-
MMBtu
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $11,027 $14,014 $5,395
66,607
kWh
$3,378
-
kW-mo/yr
- - $2,254
12 2.7135: Install occupancy sensors $3,131 $4,437 $3,131
38,659
kWh
- - - -
13 2.1321: Replace fossil fuel equipment with electrical equipment $9,592 $16,120 $(-1,842.8)
(-22,750)
kWh
- - $11,435
-
MMBtu
-
14 2.6211: Conserve energy by efficient use of vending machines $720 $1,363 $720
8,892
kWh
- - - -
15 2.9114: Use solar heat to make electricty $74,963 $432,940 $74,963
925,468
kWh
- - - -
TOTAL RECOMMENDED $212,912 $476,500 $101,126
1,248,475
kWh
$17,535
-
kW-mo/yr
$65,914
-
MMBtu
$11,435
-
MMBtu
$16,902
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs