ITAC Assessment: TT0317
ITAC logo
ITAC Assessment: TT0317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Off-Road Tires
NAICS 326211: Tire Manufacturing (except Retreading)
SIC 3011: Tires and Inner Tubes
Sales Range $100
M
to 500
M
# of Employees 275
Plant Area 320,000
ft2
Annual Production 1,092,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $839,197 18,302,472
kWh
Electricity Demand $539,202 90,279
kW-mo/yr
Natural Gas $872,829 173,656
MMBtu
Waste Disposal Costs
Water Usage $61,984 17,461
Tgal
Water Disposal $41,871 7,124
Tgal
TOTAL YEARLY COSTS $2,355,083
RECOMMENDED SAVINGS* $1,025,264 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $374,993 $42,000 - - - - - $374,993
02 2.2113: Repair or replace steam traps $79,406 $13,250 - - $79,406
-
MMBtu
- - -
03 2.6231: Utilize controls to operate equipment only when needed $859 $400 $859
18,452
kWh
- - - - -
04 2.2414: Use waste heat from hot flue gases to preheat $19,788 $13,300 - - $19,788
-
MMBtu
- - -
05 2.2511: Insulate bare equipment $2,015 $1,364 - - $2,015
-
MMBtu
- - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $169,411 $120,000 - - - - - $169,411
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,968 $2,475 $2,968
62,688
kWh
- - - - -
08 4.721: Initiate a program to acquire iso certification $64,353 $60,000 $32,058
677,191
kWh
- $32,295
-
MMBtu
- - -
09 2.4224: Upgrade controls on compressors $6,847 $8,500 $6,847
144,624
kWh
- - - - -
10 2.1242: Minimize boiler blowdown with better feedwater treatment $56,902 $80,000 - - $21,040
-
MMBtu
$9,090
-
Tgal
$15,052
-
Tgal
$11,720
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,558 $39,000 $21,103
445,767
kWh
$1,456
-
kW-mo/yr
- - - -
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,299 $16,125 $6,299
133,058
kWh
- - - - -
13 4.212: Adopt in-house material generation $205,758 $600,000 $(-6,013.0)
(-127,020)
kWh
$(-1,039.3)
-
kW-mo/yr
- - - $212,810
14 2.7142: Utilize higher efficiency lamps and/or ballasts $698 $2,910 $407
8,603
kWh
$290
-
kW-mo/yr
- - - -
15 2.4239: Eliminate or reduce compressed air usage $8,295 $40,000 $8,295
175,221
kWh
- - - - -
16 2.4321: Upgrade obsolete equipment $4,116 $50,000 $3,481
73,534
kWh
$635
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $1,025,264 $1,089,324 $76,304
1,612,119
kWh
$1,341
-
kW-mo/yr
$154,544
-
MMBtu
$9,090
-
Tgal
$15,052
-
Tgal
$768,934
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs