Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Citrus Flavor and Fragrance Ingredients
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 103,000
ft2
Annual Production 7,500
ton
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,812 3,755,009
kWh
Electricity Demand $149,563 8,576
kW-mo/yr
Electricity Fees $54,783 -
Natural Gas $210,000 19,000
MMBtu
LPG $9,560 218
MMBtu
Waste Disposal Costs
Water Usage $22,962 276
Tgal
Water Disposal $38,436 3,655
Tgal
TOTAL YEARLY COSTS $646,116
RECOMMENDED SAVINGS* $131,544 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $43,631 $322,608 $26,889
625,327
kWh
$16,742
-
kW-mo/yr
-
02 2.3191: Use demand controller or load shedder $21,772 $20,202 $11,302
262,851
kWh
$10,470
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,911 $34,076 $16,911
393,271
kWh
- -
04 2.2414: Use waste heat from hot flue gases to preheat $12,726 $12,000 - - $12,726
-
MMBtu
05 2.6231: Utilize controls to operate equipment only when needed $5,526 $20,560 $5,526
128,501
kWh
- -
06 2.1116: Improve combustion control capability $4,200 $2,000 - - $4,200
-
MMBtu
07 2.2623: Minimize condenser cooling water temperature $4,170 $6,785 $4,170
96,980
kWh
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $4,170 $2,654 $4,170
97,980
kWh
- -
09 2.1222: Install turbulators $2,277 $3,750 - - $2,277
-
MMBtu
10 2.2124: Install de-aerator in place of condensate tank $2,684 $2,743 - - $2,684
-
MMBtu
11 3.3132: Use reverse osmosis to concentrate material $3,839 $3,079 - - $3,839
-
MMBtu
12 4.661: Level zero – install control systems for existing equipment $7,429 $20,000 $3,229
75,100
kWh
- $4,200
-
MMBtu
13 4.662: Level one – add communication using iiot devices to existing control system to modify operations $1,094 - $663
15,432
kWh
- $431
-
MMBtu
14 4.424: Improve space comfort conditioning $1,115 $3,888 $1,115
25,920
kWh
- -
TOTAL RECOMMENDED $131,544 $454,345 $73,975
1,721,362
kWh
$27,212
-
kW-mo/yr
$30,357
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs