ITAC Assessment: ND0004
ITAC logo
ITAC Assessment: ND0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FUEL INJECTION LINES
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 44
Plant Area
n/a
Annual Production 1,200
thousand feet
Production Hrs. Annual 3,848
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,485 999,121
kWh
Natural Gas $12,530 2,510
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,845 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,845

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $310 $615 $310
3,517
kWh
02 2.7111: Reduce illumination to minimum necessary levels $1,370 $160 $1,370
15,826
kWh
03 2.7122: Disconnect ballasts $25 $50 $25
293
kWh
04 2.4221: Install compressor air intakes in coolest locations $1,140 $400 $1,140
13,189
kWh
TOTAL RECOMMENDED $2,845 $1,225 $2,845
32,825
kWh
TOTAL IMPLEMENTED $2,845 $1,225 $2,845
32,825
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs