ITAC Assessment: AR0058
ITAC logo
ITAC Assessment: AR0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Nickel Alloy Pipes and Tubes
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 130,000
ft2
Annual Production 1,197,981
lb
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $536,811 8,973,916
kWh
Natural Gas $182,628 55,309
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,977 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,272

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,641 $4,433 $7,641
132,474
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $3,114 $150 $3,114
57,737
kWh
-
03 2.4133: Use most efficient type of electric motors $5,949 $6,510 $5,949
103,165
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,109 - $1,109
19,343
kWh
-
05 2.3212: Optimize plant power factor $4,705 $14,960 $4,705
-
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $2,459 $1,000 - $2,459
-
MMBtu
TOTAL RECOMMENDED $24,977 $27,053 $22,518
312,719
kWh
$2,459
-
MMBtu
TOTAL IMPLEMENTED $20,272 $12,093 $17,813
312,719
kWh
$2,459
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs