| Assessment Year | 1995 |
|---|---|
| Principal Product | Nickel Alloy Pipes and Tubes |
| NAICS |
n/a
|
| SIC | 3317: Steel Pipe and Tubes |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
130,000
ft2
|
| Annual Production | 1,197,981
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $536,811 | 8,973,916 |
kWh
|
$0.060 |
| Natural Gas | $182,628 | 55,309 |
MMBtu
|
$3.30 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,977 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,272 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,641 | $4,433 |
$7,641
132,474
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $3,114 | $150 |
$3,114
57,737
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $5,949 | $6,510 |
$5,949
103,165
kWh
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,109 | - |
$1,109
19,343
kWh
|
- | |
| 05 | 2.3212: Optimize plant power factor | $4,705 | $14,960 |
$4,705
-
kWh
|
- | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,459 | $1,000 | - |
$2,459
-
MMBtu
|
|
| TOTAL RECOMMENDED | $24,977 | $27,053 |
$22,518
312,719
kWh
|
$2,459
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $20,272 | $12,093 |
$17,813
312,719
kWh
|
$2,459
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs