Assessment Year | 2017 |
---|---|
Principal Product | Rubber Seals |
NAICS | 339991: Gasket, Packing, and Sealing Device Manufacturing |
SIC | 3053: Gaskets, Packing, and Sealing Devices |
Sales Range | $10 M to 50M |
# of Employees | 20 |
Plant Area |
62,000
ft2
|
Annual Production | 6,702,219
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $200,165 | 3,268,759 |
kWh
|
$0.061 |
Electricity Demand | $42,753 | 7,863 |
kW-mo/yr
|
$5.44 |
Electricity Fees | $60,517 | - |
|
- |
Natural Gas | $27,100 | 2,356 |
MMBtu
|
$11.50 |
TOTAL YEARLY COSTS | $330,535 | |||
RECOMMENDED SAVINGS* | $84,476 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,765 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $4,712 | $20 | - | - | $4,712 | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,114 | $20 |
$994
16,293
kWh
|
$120
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,738 | $1,000 |
$6,004
98,422
kWh
|
$734
-
kW-mo/yr
|
- | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $57,323 | $15,000 |
$42,700
700,000
kWh
|
$14,623
-
kW-mo/yr
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $831 | $1,000 |
$739
12,113
kWh
|
$92
-
kW-mo/yr
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,845 | $16,000 |
$8,164
133,832
kWh
|
$1,681
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $780 | $2,067 |
$666
10,920
kWh
|
$114
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,133 | $9,520 |
$2,660
43,603
kWh
|
$473
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $84,476 | $44,627 |
$61,926
1,015,183
kWh
|
$17,838
-
kW-mo/yr
|
$4,712 | ||
TOTAL IMPLEMENTED | $11,765 | $12,607 |
$10,324
169,238
kWh
|
$1,442
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs