Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Air compressors, pumps, generators
NAICS 333912: Air and Gas Compressor Manufacturing
SIC 3563: Air and Gas Compressors
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 206,500
ft2
Annual Production 3,150
pieces
Production Hrs. Annual 2,250
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $223,150 2,215,826
kWh
Electricity Demand $35,187 6,207
kW-mo/yr
Electricity Fees $8,500 -
Natural Gas $15,215 16,783
MMBtu
Waste Disposal Costs
Water Usage $15,349 835
Tgal
Water Disposal $6,622 835
Tgal
TOTAL YEARLY COSTS $304,023
RECOMMENDED SAVINGS* $27,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 4.454: Modify startup/shutdown times $7,855 $550 $7,855
78,000
kWh
-
02 2.2211: Use optimum temperature $17,243 - $17,243
171,223
kWh
-
03 2.7442: Keep doors and windows shut when not on use $53 - $53
527
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,229 $4,600 $1,469
14,583
kWh
$760
-
kW-mo/yr
TOTAL RECOMMENDED $27,380 $5,150 $26,620
264,333
kWh
$760
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs