ITAC Assessment: UF0513
ITAC logo
ITAC Assessment: UF0513
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Apple and Citrus Flavors
NAICS 311423: Dried and Dehydrated Food Manufacturing
SIC 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 49,295
ft2
Annual Production 26,566,000
lb
Production Hrs. Annual 4,992
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,099 1,837,840
kWh
Electricity Demand $37,833 4,855
kW-mo/yr
Electricity Fees $23,802 -
Natural Gas $75,908 10,608
MMBtu
Waste Disposal Costs
Water Usage $15,192 4,157
Tgal
TOTAL YEARLY COSTS $258,835
RECOMMENDED SAVINGS* $103,314 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,802

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1224: Replace boiler $38,664 $30,000 - - $38,664
-
MMBtu
-
02 2.2522: Isolate hot or cold equipment $25,893 $3,150 $25,893
454,272
kWh
- - -
03 2.7232: Replace existing hvac unit with high efficiency model $14,487 $23,157 $14,487
254,160
kWh
- - -
04 2.2312: Minimize non-essential material in heat treatment process $7,542 - - - $3,798
-
MMBtu
$3,744
05 2.7491: Insulate glazing, walls, ceilings, and roofs $6,342 $27,695 $6,342
111,266
kWh
- - -
06 2.4133: Use most efficient type of electric motors $5,848 $10,386 $4,265
74,821
kWh
$1,583
-
kW-mo/yr
- -
07 2.2136: Install / repair insulation on steam lines $2,443 $1,481 - - $2,443
-
MMBtu
-
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,095 $5,053 $2,095
36,757
kWh
- - -
TOTAL RECOMMENDED $103,314 $100,922 $53,082
931,276
kWh
$1,583
-
kW-mo/yr
$44,905
-
MMBtu
$3,744
TOTAL IMPLEMENTED $58,802 $60,536 $48,817
856,455
kWh
- $6,241
-
MMBtu
$3,744
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs