ITAC Assessment: UD1121
ITAC logo
ITAC Assessment: UD1121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Education
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 100
Plant Area 95,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,922 992,669
kWh
Natural Gas $14,615 2,914
MMBtu
Waste Disposal Costs
Water Usage $6,800 570
Tgal
TOTAL YEARLY COSTS $89,337
RECOMMENDED SAVINGS* $21,462 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1224: Replace boiler $2,668 $50,000 - $2,668
-
MMBtu
02 2.2628: Utilize a less expensive cooling method $6,748 $500 $6,748
98,628
kWh
-
03 2.4322: Use or replace with energy efficient substitutes $388 $7,500 - $388
-
MMBtu
04 2.2628: Utilize a less expensive cooling method $70 $300 $70
1,024
kWh
-
05 2.4322: Use or replace with energy efficient substitutes $270 $7,500 $(-225.0)
(-3,290)
kWh
$495
-
MMBtu
06 2.9114: Use solar heat to make electricty $816 $500 $816
11,927
kWh
-
07 2.9114: Use solar heat to make electricty $10,502 $160,000 $10,502
153,480
kWh
-
TOTAL RECOMMENDED $21,462 $226,300 $17,911
261,769
kWh
$3,551
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs