ITAC Assessment: SD0305
ITAC logo
ITAC Assessment: SD0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product microelectronics
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 37,000
ft2
Annual Production 5,500,000
pieces
Production Hrs. Annual 4,812
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,027 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $896

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,294 $20,368 $9,063
80,845
kWh
$2,231
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,481 $10,300 $4,658
41,548
kWh
$823
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,106 - $1,766
15,756
kWh
$340
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $896 $1,800 $896
7,997
kWh
- - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,100 $5,000 - - - $2,100
-
lb
06 3.1191: Change procedures / equipment / operating conditions $3,150 - - - $3,150
-
gal
-
TOTAL RECOMMENDED $25,027 $37,468 $16,383
146,146
kWh
$3,394
-
kW-mo/yr
$3,150
-
gal
$2,100
-
lb
TOTAL IMPLEMENTED $896 $1,800 $896
7,997
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs