Assessment Year | 2002 |
---|---|
Principal Product | microelectronics |
NAICS |
n/a
|
SIC | 3672: Printed Circuit Boards |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
37,000
ft2
|
Annual Production | 5,500,000
pieces
|
Production Hrs. Annual | 4,812
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,027 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $896 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,294 | $20,368 |
$9,063
80,845
kWh
|
$2,231
-
kW-mo/yr
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,481 | $10,300 |
$4,658
41,548
kWh
|
$823
-
kW-mo/yr
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,106 | - |
$1,766
15,756
kWh
|
$340
-
kW-mo/yr
|
- | - | |
04 | 2.7135: Install occupancy sensors | $896 | $1,800 |
$896
7,997
kWh
|
- | - | - | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,100 | $5,000 | - | - | - |
$2,100
-
lb
|
|
06 | 3.1191: Change procedures / equipment / operating conditions | $3,150 | - | - | - |
$3,150
-
gal
|
- | |
TOTAL RECOMMENDED | $25,027 | $37,468 |
$16,383
146,146
kWh
|
$3,394
-
kW-mo/yr
|
$3,150
-
gal
|
$2,100
-
lb
|
||
TOTAL IMPLEMENTED | $896 | $1,800 |
$896
7,997
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs