ITAC Assessment: BD0142
ITAC logo
ITAC Assessment: BD0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Fabricated Rubber Products
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 32,000
ft2
Annual Production 700,000
lb
Production Hrs. Annual 4,290
hrs
Location (State) not found

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,641 646,249
kWh
Electricity Demand $8,133 3,456
kW-mo/yr
Electricity Fees $4,466 -
Natural Gas $4,685 1,142
MMBtu
Other Gas $1,513 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,543 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,305

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,333 $2,050 $1,227
19,050
kWh
$106
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $325 $675 $290
4,396
kWh
$35
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $141 - $128
2,052
kWh
$13
-
kW-mo/yr
- - -
04 3.2123: Convert to high volume low pressure (hvlp) paint guns $25,426 $5,000 - - - $25,426
-
gal
-
05 3.4114: Replace city water with recycled water via cooling tower $1,238 $3,500 - - $1,238
-
Tgal
- -
06 4.513: Re-arrange equipment layout to reduce labor costs $2,080 $6,500 - - - - $2,080
TOTAL RECOMMENDED $30,543 $17,725 $1,645
25,498
kWh
$154
-
kW-mo/yr
$1,238
-
Tgal
$25,426
-
gal
$2,080
TOTAL IMPLEMENTED $29,305 $14,225 $1,645
25,498
kWh
$154
-
kW-mo/yr
- $25,426
-
gal
$2,080
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs