Assessment Year | 1992 |
---|---|
Principal Product | PRESSURE SENSITIVE LABEL |
NAICS |
n/a
|
SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 438 |
Plant Area |
n/a
|
Annual Production | 283,000
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $294,956 | 5,008,206 |
kWh
|
$0.059 |
Natural Gas | $8,678 | 2,210 |
MMBtu
|
$3.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,630 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,489 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7226: Use computer programs to optimize hvac performance | $16,449 | $20,000 |
$16,449
61,547
kWh
|
- | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,970 | $525 |
$3,970
67,409
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,071 | $1,500 |
$2,071
35,170
kWh
|
- | |
04 | 2.2437: Recover waste heat from equipment | $621 | $150 |
$138
2,345
kWh
|
$483
-
MMBtu
|
|
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,252 | - |
$5,575
95,545
kWh
|
$(-2,323.0)
-
MMBtu
|
|
06 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $3,072 | $350 |
$3,072
52,169
kWh
|
- | |
07 | 2.7212: Install or upgrade insulation on hvac distribution systems | $3,055 | $7,752 |
$3,055
51,876
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $587 | $925 |
$587
9,965
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $449 | $229 |
$449
7,620
kWh
|
- | |
10 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $104 | $190 |
$104
1,758
kWh
|
- | |
TOTAL RECOMMENDED | $33,630 | $31,621 |
$35,470
385,404
kWh
|
$(-1,840.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $21,489 | $20,904 |
$21,006
138,921
kWh
|
$483
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs