Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,658

matching recommendations
$
$
ARC Waste minimization / pollution prevention
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1115 #03 Y:2025 Meter recycled water (to reduce sewer charges) $1,016 $760
UW2508 #04 Y:2025 Install dedicated mixing equip to optimize reuse of used rinseate & to preclude the need for inter-run cleaning $116,528 $582,640
UW2507 #06 Y:2025 Use less toxic and volatile solvent substitutes $124,957 $342,000
UF0632 #11 Y:2025 Use reverse osmosis to concentrate material $3,839 $3,079
LS2513 #01 Y:2025 Increase amount of waste recovered for resale $12,200 -
WV0682 #02 Y:2025 Minimize water usage $71,374 $60,060
MS0449 #06 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $21,369 $10,437
MS0449 #05 Y:2025 Recover and reuse waste material $24,000 $14,060
TT0331 #02 Y:2025 Minimize water usage $1,508 $400
MZ0377 #07 Y:2025 Meter recycled water (to reduce sewer charges) $31,698 $9,040
DL0259 #01 Y:2025 Change procedures / equipment / operating conditions $45,458 $19,000
UU0271 #05 Y:2025 Eliminate leaks in water lines and valves $771 $5,877
UU0271 #04 Y:2025 Minimize water usage $3,231 $23,282
UD1111 #05 Y:2025 Meter recycled water (to reduce sewer charges) $1,836 $2,500
UD1111 #01 Y:2025 Use flow control valves on equipment to optimize water use $38,544 $2,352
SD0672 #10 Y:2025 Replace water cooling on processes with air cooling $43,311 $4,700
LE0599 #06 Y:2025 Use closed cycle process to minimize waste water production $98,974 $65,000
TT0328 #05 Y:2025 Replace city water with recycled water via cooling tower $52,760 $41,250
TT0328 #01 Y:2025 Reduce or eliminate waste $296,352 $1,200,000
LE0598 #03 Y:2025 Convert to robotic painting $218,856 $362,095