Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,700

matching recommendations
$
$
ARC Waste minimization / pollution prevention
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LT8434 #05 Y:2025 Install equipment (eg compactor) to reduce disposal costs $17,419 $26,512
LT8434 #02 Y:2025 Use automatic cleaning equipment $76,382 $353
NL0123 #01 Y:2025 Eliminate a by-product $821,100 $590,100
MS0455 #03 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $675 $2,667
LT8428 #10 Y:2025 Meter waste water $137,771 $13,815
MZ0385 #07 Y:2025 Meter recycled water (to reduce sewer charges) $6,073 $110,000
MS0454 #03 Y:2025 Replace treated water with well / surface water $18,747 $35,952
MS0454 #02 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $11,257 $1,712
LT8435 #03 Y:2025 Eliminate/reduce an operation $1,199 $300
MUWT08 #01 Y:2025 Minimize water usage $25,065 $53,711
TT0342 #02 Y:2025 Use a different or recycled raw material $48,769 $16,924
NL0121 #03 Y:2025 Convert to electrostatic powder coating $8,794 $54,473
NT0051 #01 Y:2025 Reduce scrap production $98,944 $80,000
MS0453 #06 Y:2025 Change procedures / equipment / operating conditions $2,184,220 $60,000
MS0453 #04 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $7,830 $5,644
DL0261 #03 Y:2025 Change procedures / equipment / operating conditions $9,021 $7,950
NL0118 #03 Y:2025 Meter waste water $857 $985
NL0118 #02 Y:2025 Meter waste water $3,352 $1,575
MZ1016 #03 Y:2025 Minimize water usage $5,716 $2,500
MS0452 #01 Y:2025 Change procedures / equipment / operating conditions $40,000 $43,390