10,809
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AM1000 #05 Y:2026 | 05 | 2026 | Recover and reuse cooling water | $11,972 | $18,367 |
n/a
|
| AM1000 #04 Y:2026 | 04 | 2026 | Meter recycled water (to reduce sewer charges) | $21,796 | $4,405 |
n/a
|
| UD1150 #03 Y:2026 | 03 | 2026 | Use flow control valves on equipment to optimize water use | $9,875 | $528 |
n/a
|
| AM1003 #02 Y:2026 | 02 | 2026 | Meter recycled water (to reduce sewer charges) | $40,935 | - |
n/a
|
| OR0837 #04 Y:2026 | 04 | 2026 | Replace treated water with well / surface water | $8,249 | $6,786 |
n/a
|
| OR0837 #03 Y:2026 | 03 | 2026 | Use flow control valves on equipment to optimize water use | $79,017 | $25,616 |
n/a
|
| UU0311 #04 Y:2026 | 04 | 2026 | Reduce or eliminate waste | $3,600 | $4,640 |
n/a
|
| UF0652 #07 Y:2026 | 07 | 2026 | Replace the chlorination stage with an oxygen or ozone stage | $3,650 | $7,600 |
n/a
|
| UF0652 #06 Y:2026 | 06 | 2026 | Use filter and drying oven to reduce sludge volume | $12,547 | $30,000 |
n/a
|
| UF0652 #05 Y:2026 | 05 | 2026 | Use counter current rinsing to reduce waste water | $323,609 | $1,053,043 |
n/a
|
| SJ0058 #03 Y:2026 | 03 | 2026 | Install equipment (eg compactor) to reduce disposal costs | $4,439 | $34,800 |
n/a
|
| IC0354 #11 Y:2026 | 11 | 2026 | Contract a wood pallet recycling company | $27,720 | - |
n/a
|
| SJ0057 #11 Y:2026 | 11 | 2026 | Minimize water usage | $1,880 | $8,595 |
n/a
|
| IP0221 #04 Y:2026 | 04 | 2026 | Meter recycled water (to reduce sewer charges) | $10,527 | $5,080 |
n/a
|
| UF0651 #05 Y:2026 | 05 | 2026 | Meter waste water | $4,190 | $4,384 |
n/a
|
| MUCM42 #08 Y:2026 | 08 | 2026 | Eliminate/reduce an operation | $3,691 | - |
n/a
|
| SU0608 #04 Y:2026 | 04 | 2026 | Eliminate/reduce an operation | $2,913 | - |
n/a
|
| NL0140 #05 Y:2026 | 05 | 2026 | Meter waste water | $679 | $266 |
n/a
|
| NL0140 #04 Y:2026 | 04 | 2026 | Minimize water usage | $1,800 | $1,421 |
n/a
|
| MUCM41 #09 Y:2026 | 09 | 2026 | Maintain machines to reduce leaks | $639 | $19 |
n/a
|