Assessment Year | 2025 |
---|---|
Principal Product | Printed Circuit Boards |
NAICS | 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3672: Printed Circuit Boards |
Sales Range | $10 M to 50M |
# of Employees | 192 |
Plant Area |
87,000
ft2
|
Annual Production | 332,603
units
|
Production Hrs. Annual | 3,276
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $70,961 | 1,825,600 |
kWh
|
$0.039 | |
Electricity Demand | $72,010 | 6,441 |
kW-mo/yr
|
$11.18 | |
Electricity Fees | $4,529 | - |
|
- | |
Natural Gas | $7,089 | 8,055 |
MMBtu
|
$0.88 | |
Waste Disposal Costs | |||||
Water Usage | $20,131 | 1,305 |
Tgal
|
$15.43 | |
TOTAL YEARLY COSTS | $174,719 | ||||
RECOMMENDED SAVINGS* | $149,850 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.1192: Reduce scrap production | $98,944 | $80,000 | - | - | - | $98,944 | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $32,918 | $193,830 |
$1,848
47,504
kWh
|
- | - | $31,070 | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $12,814 | - |
$6,240
160,530
kWh
|
$6,574
-
kW-mo/yr
|
- | - | |
04 | 2.3212: Optimize plant power factor | $2,603 | $6,709 | - | - | $2,603 | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,986 | $5,609 |
$966
24,841
kWh
|
$1,020
-
kW-mo/yr
|
- | - | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $586 | - |
$586
15,057
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $149,850 | $286,148 |
$9,640
247,932
kWh
|
$7,594
-
kW-mo/yr
|
$2,603 | $130,014 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs