ITAC Assessment: AR0176
ITAC logo
ITAC Assessment: AR0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Machine Tool Accessories
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $10
M
to 50
M
# of Employees 194
Plant Area 59,150
ft2
Annual Production 190,000,000
pieces
Production Hrs. Annual 7,280
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,961 6,722,157
kWh
Electricity Demand $52,783 12,419
kW-mo/yr
Natural Gas $2,720 524
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,129 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $659 $1,135 $530
17,585
kWh
$129
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $4,051 $360 $3,235
146,835
kWh
$816
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $30 $287 $24
1,172
kWh
$6
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $946 $2,237 $524
23,740
kWh
$422
-
kW-mo/yr
- -
05 3.1162: Use less wasteful packaging $2,479 $1,300 - - $2,479 -
06 4.652: Replace existing equipment with more suitable substitutes $8,964 $17,500 - - - $8,964
TOTAL RECOMMENDED $17,129 $22,819 $4,313
189,332
kWh
$1,373
-
kW-mo/yr
$2,479 $8,964
TOTAL IMPLEMENTED - - - - - -