| Assessment Year | 1999 |
|---|---|
| Principal Product | Machine Tool Accessories |
| NAICS |
n/a
|
| SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 194 |
| Plant Area |
59,150
ft2
|
| Annual Production | 190,000,000
pieces
|
| Production Hrs. Annual | 7,280
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $148,961 | 6,722,157 |
kWh
|
$0.022 |
| Electricity Demand | $52,783 | 12,419 |
kW-mo/yr
|
$4.25 |
| Natural Gas | $2,720 | 524 |
MMBtu
|
$5.19 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,129 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $659 | $1,135 |
$530
17,585
kWh
|
$129
-
kW-mo/yr
|
- | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $4,051 | $360 |
$3,235
146,835
kWh
|
$816
-
kW-mo/yr
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $30 | $287 |
$24
1,172
kWh
|
$6
-
kW-mo/yr
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $946 | $2,237 |
$524
23,740
kWh
|
$422
-
kW-mo/yr
|
- | - | |
| 05 | 3.1162: Use less wasteful packaging | $2,479 | $1,300 | - | - | $2,479 | - | |
| 06 | 4.652: Replace existing equipment with more suitable substitutes | $8,964 | $17,500 | - | - | - | $8,964 | |
| TOTAL RECOMMENDED | $17,129 | $22,819 |
$4,313
189,332
kWh
|
$1,373
-
kW-mo/yr
|
$2,479 | $8,964 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs