ITAC Assessment: NL0113
ITAC logo
ITAC Assessment: NL0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Custom Molded Rubber
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 71,400
ft2
Annual Production 15,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,813 1,328,134
kWh
Natural Gas $7,393 1,418
MMBtu
Waste Disposal Costs
Water Usage $30,669 14,338
Tgal
Water Disposal $48,202 14,338
Tgal
TOTAL YEARLY COSTS $219,077
RECOMMENDED SAVINGS* $1,763,746 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
01 2.4322: Use or replace with energy efficient substitutes $1,107,096 $3,374,250 $79,872
798,720
kWh
- - $(-10,067.0) - - - $1,037,291
02 2.4322: Use or replace with energy efficient substitutes $542,223 $1,261,250 $96,670
966,701
kWh
- - $1,000 - - - $444,553
03 3.4154: Eliminate leaks in water lines and valves $58,063 $520 - $22,577
-
Tgal
$35,486
-
Tgal
- - - - -
04 3.4116: Meter recycled water (to reduce sewer charges) $43,590 $52,034 - - $43,865
-
Tgal
- $(-275.0) - - -
05 2.8121: Apply for tax-free status for energy purchases $5,520 $400 - - - - - - $5,520 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,978 $3,292 $3,978
39,787
kWh
- - - - - - -
07 2.7135: Install occupancy sensors $2,902 $772 $2,902
29,016
kWh
- - - - - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $374 $500 $674
6,740
kWh
- - $(-200.0) - $(-100.0) - -
TOTAL RECOMMENDED $1,763,746 $4,693,018 $184,096
1,840,964
kWh
$22,577
-
Tgal
$79,351
-
Tgal
$(-9,267.0) $(-275.0) $(-100.0) $5,520 $1,481,844
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs