ITAC Assessment: KU0074
ITAC logo
ITAC Assessment: KU0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product WALNUT LUMBER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $1
M
to 5
M
# of Employees 44
Plant Area
n/a
Annual Production 3,500
thousand feet
Production Hrs. Annual 2,125
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,636 1,596,424
kWh
Natural Gas $33,989 10,086
MMBtu
Wood $294,185 152,409
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,417 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $89,417

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Wood Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $24,439 $1,400 - $3,044
-
MMBtu
$21,395
-
MMBtu
02 2.5123: Reduce fluid flow rates $26,145 $2,920 - $3,257
-
MMBtu
$22,888
-
MMBtu
03 2.1243: Use heat from boiler blowdown to preheat boiler feed water $14,284 $5,200 - $1,779
-
MMBtu
$12,505
-
MMBtu
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $4,370 $1,756 - $544
-
MMBtu
$3,826
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $1,448 $358 - $180
-
MMBtu
$1,268
-
MMBtu
06 2.2135: Repair and eliminate steam leaks $2,905 $100 - $362
-
MMBtu
$2,543
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $841 $238 $841
13,189
kWh
- -
08 2.7447: Install vinyl strip / high speed / air curtain doors $12,687 $9,759 - $1,580
-
MMBtu
$11,107
-
MMBtu
09 2.6212: Turn off equipment during breaks, reduce operating time $851 $306 $851
13,482
kWh
- -
10 2.6212: Turn off equipment during breaks, reduce operating time $897 - $897
14,068
kWh
- -
11 2.4231: Reduce the pressure of compressed air to the minimum required $345 - $345
5,569
kWh
- -
12 2.4221: Install compressor air intakes in coolest locations $205 $150 $205
3,224
kWh
- -
TOTAL RECOMMENDED $89,417 $22,187 $3,139
49,532
kWh
$10,746
-
MMBtu
$75,532
-
MMBtu
TOTAL IMPLEMENTED $89,417 $22,187 $3,139
49,532
kWh
$10,746
-
MMBtu
$75,532
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs