ITAC Assessment: NC0548
ITAC logo
ITAC Assessment: NC0548
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Chillers
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $100
M
to 500
M
# of Employees 465
Plant Area 600,000
ft2
Annual Production 2,330
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $922,100 14,587,740
kWh
Electricity Demand $194,200 53,677
kW-mo/yr
Natural Gas $269,302 52,354
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,266 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,174

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $23,830 $85,000 - $23,830
-
MMBtu
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $13,922 $5,000 $13,922
-
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,958 $6,100 $3,958
62,832
kWh
- - -
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $4,478 $7,000 - $4,478
-
MMBtu
- -
05 2.2121: Increase amount of condensate returned $6,019 $1,500 - $6,019
-
MMBtu
- -
06 2.4239: Eliminate or reduce compressed air usage $1,418 $7,500 $1,418
22,500
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $708 $100 $1,128
17,904
kWh
- $(-300.0) $(-120.0)
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,444 $100 $1,444
22,920
kWh
- - -
09 2.4151: Develop a repair/replace policy $1,904 $4,258 $1,904
30,221
kWh
- - -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,585 $281 $1,585
25,154
kWh
- - -
TOTAL RECOMMENDED $59,266 $116,839 $25,359
181,531
kWh
$34,327
-
MMBtu
$(-300.0) $(-120.0)
TOTAL IMPLEMENTED $14,174 $12,239 $8,575
136,111
kWh
$6,019
-
MMBtu
$(-300.0) $(-120.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs