Assessment Year | 2017 |
---|---|
Principal Product | Perishable Prepared Foods |
NAICS | 311991: Perishable Prepared Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
80,000
ft2
|
Annual Production | 12,000,000
units
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,823,744 | 52,920,000 |
kWh
|
$0.053 |
Electricity Demand | $148,281 | 29,086 |
kW-mo/yr
|
$5.10 |
Electricity Fees | $12,743 | - |
|
- |
Natural Gas | $15,868 | 12,469 |
MMBtu
|
$1.27 |
TOTAL YEARLY COSTS | $3,000,636 | |||
RECOMMENDED SAVINGS* | $18,728 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $6,587 | $25,166 | - | - | $6,587 | |
02 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $3,658 | $290 |
$3,658
68,503
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $104 | $165 |
$104
1,945
kWh
|
- | - | |
04 | 2.7135: Install occupancy sensors | $443 | $1,238 |
$443
8,295
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,696 | $1,050 |
$6,806
127,458
kWh
|
$890
-
kW-mo/yr
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $240 | $270 |
$199
3,802
kWh
|
$41
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $18,728 | $28,179 |
$11,210
210,003
kWh
|
$931
-
kW-mo/yr
|
$6,587 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs