ITAC Assessment: BS0108
ITAC logo
ITAC Assessment: BS0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Perishable Prepared Foods
NAICS 311991: Perishable Prepared Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 80,000
ft2
Annual Production 12,000,000
units
Production Hrs. Annual 5,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,823,744 52,920,000
kWh
Electricity Demand $148,281 29,086
kW-mo/yr
Electricity Fees $12,743 -
Natural Gas $15,868 12,469
MMBtu
TOTAL YEARLY COSTS $3,000,636
RECOMMENDED SAVINGS* $18,728 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $6,587 $25,166 - - $6,587
02 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $3,658 $290 $3,658
68,503
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $104 $165 $104
1,945
kWh
- -
04 2.7135: Install occupancy sensors $443 $1,238 $443
8,295
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,696 $1,050 $6,806
127,458
kWh
$890
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $240 $270 $199
3,802
kWh
$41
-
kW-mo/yr
-
TOTAL RECOMMENDED $18,728 $28,179 $11,210
210,003
kWh
$931
-
kW-mo/yr
$6,587
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs