ITAC Assessment: OK1001
ITAC logo
ITAC Assessment: OK1001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product asphalt roofing and paving material
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 17
Plant Area 304,920
ft2
Annual Production 95,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,835 1,899,200
kWh
Electricity Demand $47,884 12,064
kW-mo/yr
Natural Gas $159,675 59,879
MMBtu
Waste Disposal Costs
Water Usage $4,546 857
Tgal
TOTAL YEARLY COSTS $308,940
RECOMMENDED SAVINGS* $12,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,799

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $1,894 $955 - - $1,894 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,799 $3,509 $1,799
35,276
kWh
- - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,474 $11,240 - - - $1,474
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,178 $16,224 $4,178
81,924
kWh
- - -
05 2.7232: Replace existing hvac unit with high efficiency model $2,655 $15,329 $2,067
40,537
kWh
$588
-
kW-mo/yr
- -
TOTAL RECOMMENDED $12,000 $47,257 $8,044
157,737
kWh
$588
-
kW-mo/yr
$1,894 $1,474
-
MMBtu
TOTAL IMPLEMENTED $1,799 $3,509 $1,799
35,276
kWh
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs