Assessment Year | 2019 |
---|---|
Principal Product | asphalt roofing and paving material |
NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 17 |
Plant Area |
304,920
ft2
|
Annual Production | 95,000
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $96,835 | 1,899,200 |
kWh
|
$0.051 | |
Electricity Demand | $47,884 | 12,064 |
kW-mo/yr
|
$3.97 | |
Natural Gas | $159,675 | 59,879 |
MMBtu
|
$2.67 | |
Waste Disposal Costs | |||||
Water Usage | $4,546 | 857 |
Tgal
|
$5.30 | |
TOTAL YEARLY COSTS | $308,940 | ||||
RECOMMENDED SAVINGS* | $12,000 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $1,799 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $1,894 | $955 | - | - | $1,894 | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,799 | $3,509 |
$1,799
35,276
kWh
|
- | - | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,474 | $11,240 | - | - | - |
$1,474
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,178 | $16,224 |
$4,178
81,924
kWh
|
- | - | - | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $2,655 | $15,329 |
$2,067
40,537
kWh
|
$588
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $12,000 | $47,257 |
$8,044
157,737
kWh
|
$588
-
kW-mo/yr
|
$1,894 |
$1,474
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,799 | $3,509 |
$1,799
35,276
kWh
|
- | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs