ITAC Assessment: DL0261
ITAC logo
ITAC Assessment: DL0261
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Wood/gas/pellet stove
NAICS 335221: Household Cooking Appliance Manufacturing
SIC 3631: Household Cooking Equipment
Sales Range $500
k
to 1
M
# of Employees 150
Plant Area 110,000
ft2
Annual Production 39,000
units
Production Hrs. Annual 5,100
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,385 2,345,250
kWh
Electricity Demand $35,219 8,838
kW-mo/yr
Electricity Fees $720 -
LPG $75,476 2,993
MMBtu
TOTAL YEARLY COSTS $358,800
RECOMMENDED SAVINGS* $52,690 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.6218: Turn off equipment when not in use $5,489 $720 $1,128
10,740
kWh
$4,361
-
MMBtu
02 2.6231: Utilize controls to operate equipment only when needed $4,374 - $996
9,482
kWh
$3,378
-
MMBtu
03 3.1191: Change procedures / equipment / operating conditions $9,021 $7,950 $1,508
14,363
kWh
$7,513
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,337 $90,000 $15,337
146,062
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,186 $16,400 $14,186
135,100
kWh
-
06 2.4323: Use optimum size and capacity equipment $4,283 $1,200 $4,283
40,786
kWh
-
TOTAL RECOMMENDED $52,690 $116,270 $37,438
356,533
kWh
$15,252
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs