ITAC Assessment: TN0375
ITAC logo
ITAC Assessment: TN0375
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product WOMEN'S SPORTSWEAR
NAICS
n/a
SIC 2339: Women's, Misses', and Juniors' Outerwear, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area
n/a
Annual Production 2,300,000
pieces
Production Hrs. Annual 4,320
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,001 2,731,536
kWh
Natural Gas $35,284 7,708
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,885 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2136: Install / repair insulation on steam lines $1,826 $622 - $1,826
-
MMBtu
-
02 2.2135: Repair and eliminate steam leaks $1,822 $360 - $1,822
-
MMBtu
-
03 2.7123: Keep lamps and reflectors clean $4,940 $11,550 $4,836
91,149
kWh
- $104
04 2.2163: Use minimum steam operating pressure $511 - - $511
-
MMBtu
-
05 2.2511: Insulate bare equipment $474 $442 - $474
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $354 $300 - $354
-
MMBtu
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,387 - $1,387
17,878
kWh
- -
08 2.2122: Install / repair insulation on condensate lines $166 $60 - $166
-
MMBtu
-
09 2.2531: Re-size charging openings or add movable cover or door $79 - - $79
-
MMBtu
-
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $326 $84 $326
6,155
kWh
- -
TOTAL RECOMMENDED $11,885 $13,418 $6,549
115,182
kWh
$5,232
-
MMBtu
$104
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs