ITAC Assessment: UD1115
ITAC logo
ITAC Assessment: UD1115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product matress
NAICS 337910: Mattress Manufacturing
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $10
M
to 50
M
# of Employees 56
Plant Area 212,975
ft2
Annual Production 307,858,723
units
Production Hrs. Annual 3,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $142,641 1,091,231
kWh
Electricity Demand $41,174 6,015
kW-mo/yr
Electricity Fees $5,871 -
Natural Gas $22,336 7,999
MMBtu
Waste Disposal Costs
Water Usage $1,467 497
Tgal
Water Disposal $1,758 497
Tgal
TOTAL YEARLY COSTS $215,247
RECOMMENDED SAVINGS* $34,416 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,515 $7,035 $23,798
183,062
kWh
$1,717
-
kW-mo/yr
- -
02 2.3212: Optimize plant power factor $2,927 $3,700 - - $2,927 -
03 3.4116: Meter recycled water (to reduce sewer charges) $1,016 $760 - - - $1,016
-
Tgal
04 2.2511: Insulate bare equipment $892 $1,267 $892
6,828
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,587 $5,423 $2,139
16,369
kWh
$448
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $1,479 $1,015 $1,219
9,327
kWh
$260
-
kW-mo/yr
- -
TOTAL RECOMMENDED $34,416 $19,200 $28,048
215,586
kWh
$2,425
-
kW-mo/yr
$2,927 $1,016
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs